Laserfiche WebLink
Soil EPA 8020 BTEX 5 ug/Kg <br /> Soil EPA 8015M TPH 1 mg/Kg <br /> Water EPA 8020 BTEX 0.3 ug/L <br /> Water EPA 8015M TPH 50 ug/L 9d <br /> Water 8260 Oxygenates 5 ug/L <br /> Soil EPA 8015M TPH 1 mg/Kg <br /> The Health and Safety Plan will remain the same as in the previous Work Plans . <br /> The EHD has requested that we suggest a method of checking the contamination at the surface of <br /> the water table, since several wells have submerged screen sections and receive water at present <br /> about 10 feet below the water table. Wells BM- 1 , BM-2 and BW3 are screened from 35 to 50 feet <br /> and the present water table is 33 feet below the surface. The water sampled in these wells is <br /> representative of the surface water after purging . The regulator stated that perhaps we could not <br /> see floating product in well screened under the water table. This is true , however, we have never <br /> seen any floating product at this site, even when the site was sampled in 1989 when the water <br /> table was 42 feet bgs or deeper. Therefore, this concern is not valid for this site . <br /> The sampling of wells BM- 1 , BM-2 , BW3 and the new well BW13 should give us assurance that <br /> the groundwater contamination is being measured and sampled realistically. At the same time we <br /> would like to discontinue sampling wells BM-6, BM-7 , BM-8 and BM-9. <br /> The new well BM- 13 will be drilled close to well BM-8. The water in this area has crossed the <br /> source area and this is the first opportunity outside of traffic. A proposed well design is shown in <br /> Figure 2 . The well will be drilled to 45 feet and the screen will be placed from 45 to 25 feet. <br /> Opposite the screen will be placed in the annulus Number 3 sand . Above the sand will be a 3 foot <br /> thick transitional seal of hydrated bentonite and above the seal the annulus will be filled with <br /> hydrated cement. <br /> After the well is completed the top of the casing will be surveyed and the well will be developed. <br /> SCHEDULE <br /> The proposed schedule will be followed after the approval of this work plan is received and the site <br /> has been approved by the State UST Fund . <br /> Contract drilling company 2 weeks <br /> Drill and Sample 2 boring 2 Days <br /> Drill and construct 1 well 1 Day <br /> Write and submit report on activities 4 weeks <br /> If there are any questions please contact me at (209) 527- 1247 . <br />