My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:51:19 AM
Creation date
3/5/2019 9:28:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> H Dual Phase Extraction Pilot Test Work Plan <br /> Former Beneto Facility, 749 East Charter Way, Stockton, California <br /> Page 5 <br /> Analysis Abbreviation Designation USEPA Method No , <br /> Total Petroleum TPH Aromatic <br /> t_ <br /> Hydrocarbons as Gasoline g <br /> Hydrocarbon <br /> Benzene <br /> Toluene Aromatic <br /> . I Eth (benzene BTEX Volatile <br /> Organics <br /> Xylenes Total 8260B <br /> . <br /> Tertiary Butyl Alcohol BA, Methyl TertiaryButyl Ether TBE <br /> IP <br /> Five FuelDi-isopropyl Ether E Oxygenate <br /> s <br /> Ethyl TertiaryButyl Ether <br /> Tertiary Amyl Methyl Ether TAME <br /> At the conclusion of the test extracted groundwater will be properly disposed to the sanitary <br /> sewer if possible or at an appropriate facility. <br /> OBJECTIVES AND REPORTING <br /> The main objectives of this DPE test are to verify soil vapor extraction and groundwater ROIs, <br /> and verify groundwater yield and hydraulic influence during the DPE extraction test. Apex will <br /> calculate dissolved vapor phase mass extraction rates from monitoring wells MWA and MW-5 <br /> (and possibly MW-4) . The DPE pilot test will aid in the design of a future remediation system, <br /> and extract hydrocarbons from the subsurface. <br /> Once the analytical data, groundwater, and SVE flow data are reviewed, a results report will be <br /> r1 prepared documenting the results of the DPE pilot test. Based on the results of the DPE test, a <br /> f DPE system will be designed and installed at the subject site if warranted. <br /> i1. <br /> - i <br /> J <br /> IJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.