i <br /> San Joaquin County Environmental Health Department <br /> RE: Beneto, Inc., 749 E. Charter Way, Stockton, CA <br /> Page 2 of 4 <br /> equipment and conductor casing will be set across the potentially contaminated upper aquifer <br /> zone(s). Well MWI7B will be completed with a screened interval from approximately 85-95 feet <br /> bgs and well MW18C will be completed with a screened interval from approximately 130- 140 <br /> feet bgs, based upon the results of the CPT investigation conducted in July 2005 . A copy of the <br /> CPT log (boring B-4) from the previous investigation is included in Attachment 1 . <br /> Drilling and Well Construction <br /> MW 17B <br /> An 11 '/4-inch diameter boring will be drilled with mud rotary equipment to a depth of <br /> approximately 80 feet bgs at which point a clay bed should be present. Drilling mud will be kept <br /> in a slightly overbalanced condition in order to minimize fluid en <br /> g y try into the well bore. 6 5/s inch Dv <br /> Z5 1 7 diameter welded steel conductor casing led by a grouting shoe will be set in the clay bed for <br /> grouting. Three equally spaced centralizers will be installed on the casing to ensure a uniform <br /> thickness of annular seal and to prevent cement channeling. The conductor casing will be <br /> grouted through the shoe with Class II neat cement, which will be circulated through the annulus <br /> to the surface and allowed to cure for a period of approximately 48-72 hours . <br /> After the cement has cured, the grout shoe will be drilled out and a 6-inch diameter boring will <br /> be advanced to a depth of approximately 95 feet bgs using mud rotary equipment. Drilling mud <br /> will be changed after drilling out the shoe and will be kept in an overbalanced condition to <br /> minimize fluid entry and to control possible heaving sands. <br /> Ln ` _ To complete the well, 2-inch diameter PVC casing equipped with centralizers and 10 feet of <br /> 0.020 slot pre-packed screen will be set from the bottom of the boring, to grade. The screened <br /> b ' � interval will be from approximately 85-95 feet bgs. Approximately 2 additional feet of filter <br /> pack will be placed above the pre-packed screen. The remaining annulus will be completed with <br /> 2 feet of bentonite overlain by neat cement grout to the surface, emplaced with a tremie system. <br /> At the surface, the well will be fitted with a locking cap and watertight, traffic rated well box. A <br /> well construction diagram for MW 17B is shown on Figure 3 . <br /> h MW18C <br /> An 11 '/4-inch diameter boring will be drilled with mud rotary equipment to a depth of <br /> approximately 115 feet bgs at which point a clay bed should be present. Drilling mud will be <br /> kept in a slightly overbalanced condition in order to minimize fluid entry into the well bore. 6 %- <br /> inch diameter welded steel conductor casing led by a grouting shoe will be set in the clay bed for <br /> grouting. Three equally spaced centralizers will be installed on the casing to ensure a uniform <br /> thickness of annular seal and to prevent cement channeling. The conductor casing will be <br /> grouted through the shoe with Class II neat cement, which will be circulated through the annulus <br /> to the surface and allowed to cure for a period of approximately 48-72 hours. <br /> After the cement has cured, the grout shoe will be drilled out and a 6-inch diameter boring will <br /> be advanced to a depth of approximately 140 feet bgs using mud rotary equipment. Drilling mud <br /> UAL&PTenetoMKPLAN_deepwells.doc <br />