My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012564
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
ARCHIVED REPORTS XR0012564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 10:33:11 AM
Creation date
3/5/2019 9:31:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012564
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� "ter � �,., �• _�� 4' s .._9�� ,:,c'�� _.� q,r 'r F�. -L,- - k y'� '^ <br /> c <br /> s <br /> 11-4 .lana 30, 1991 <br /> � CASCO Gasoline StationJanuary <br /> A-1 <br /> Project No. 3••30054-31 <br /> SITE SAFETY PLAN <br /> FOR <br /> -' GA5CO GASOLINE STATION - <br /> 749 EAST CHARTER WAY <br /> STOCK'1ON, CALIFORNIA <br /> -- PURPOSE AND SCOPE <br /> This Site Safety Plan (SSP) establishes the basic safety juidelines hnd requiremeWfor <br /> the construction of groundwater monitoring wells at the CIASCO facility located in <br /> Stockton, California. The SSP addresses hazards that may be, encountered during this <br /> project. Field activities are scheduled to begin in August 1990. <br /> M <br /> The provisions set forth in this SSP shall apply to Exceltech, Inc. (Exceltech), <br /> employees and any subcontractors working for Exceltech at the job site. All personnel <br /> working fcr Exceltech at the job site must read this SSP and sign the attached <br /> Compliance Agreement before entering the work area. <br /> �.•.� Field personnel may deviate from the safety provisions set forth in this SSP, but only to <br /> ' upgrade or increase the safety requirements. All modifications to this SSP require the ' <br /> express written approval of an Exceltech Office Safety Coordinator or the Exceltech <br /> Corporate Safety Officer. Exceltech personnel may suspend work if unauthorized <br /> modifications to the safety provisions set forth in this SSP are made. If changes in site <br /> or working conditions require changes in safety procedures, appru'date amendments to <br /> this SSP will be provided by the Exceltech Project Manager, with the approval of an <br /> ' Exceltech Office Safety Coordinator or the ExceltP„oh Corporate safety Officer, <br /> I. FACILITY BACKGROUND/WORK PLAN <br /> Site Description and History <br /> Three groundwater monitoring wells installed at the site by CalifomiO Geophysical <br /> Group, Inc. Soil and groundwater sampling has revealed the following chemicals in the <br /> �.; groundwater at the site. <br /> + TPN{3 <br /> • Benzene <br /> • Toluene <br /> • Xylenes <br /> • Ethyl benzene <br />
The URL can be used to link to this page
Your browser does not support the video tag.