My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012564
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
ARCHIVED REPORTS XR0012564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 10:33:11 AM
Creation date
3/5/2019 9:31:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012564
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sa ; <br /> d rrj. ax -m ytea. "MS. �. <br /> � '3^�. �.r}`~�,. ,�,. fix`' r'� �a+Y �. "�` s,.�;' _ � _i,. ° � r. •9 . <br /> SOIL SAMPLING PROTOCOL <br /> I. SOIL SAMPLING BY DRILLING RIG <br /> 1) Review site proposal for boring locations and special instructions. Confirm <br /> boring locations in field with client. Have Underground Service Alert (USA) <br /> mark utilities in area prior to drilling. <br /> 2) Prior to initiating an exploratory boring,all equipment to be used during drilling <br /> and sampling operation is steam cleaned. Such equipment includes, but is not <br /> lirmted to, augers, bits, drilling rod, samplers, and brass sampler liners. <br /> Additionally,between sampling intervals,the sampler is thoroughly cleaned with <br /> a dilute trisodium phosphate solution and rinsed with clean tap water or distilled <br /> watc.. <br /> 3) Each exploratory boring is drilled with a truck-mounted drilling rig using either <br /> solid flight or hollow stem augers. The boring is advanced to the desired <br /> sampling depth and the sampler is lowered to the bottom of the hole. The <br /> sampler is driven a maximum of 18 inches into the undisturbed soils ahead of the <br /> auger by a 140-pound, rig-operated hammer falling 30 inches. The number of <br /> blows required to drive the sampler the final 12 inches is recorded on the boring <br /> log. When necessary,the sampler may be pushed by the drill rig hydraulics. In <br /> - this case,the prrssure exerted(in pounds per square inch)is recorded. After the <br /> sampler has penetrated the full depth,it is retrieved to the surface. <br /> 4) The samplers commonly used are either a California modified sampler (3 inch or <br /> 2.5 inch O.D.) or a standard penetrometer (2 inch O.D.). The standard <br /> penetrometer does not contain sample liners and is used to determine soil strength <br /> characteristics and visually characterize the subsurface materials.If samples are <br /> collected for laboratory analysis the California modified sampler,equipped with <br /> brass liners,is used except when the analysis will include copper or zinc, lr, this <br /> instance,the sample should be taken with the standard penetrorneter and placed in <br /> a labeled plastic bag. <br /> Upon retrieval, the sampler is disassembled into its czmponent parts. One or <br /> more of the liners is selected for chemical analysis. The ends of the selected <br /> liner(s)are sealed with aluminum foil or teflon tape,capped with plastic caps, <br /> EXCELTECH, INC. <br /> Soil Sampling Protocol <br /> M Latest Revision: March 28, 1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.