Laserfiche WebLink
`Fp <br /> FER <br /> t <br /> to 3 of 6 Pages <br /> s. <br /> 171 <br /> Fit <br /> TABLE 1 <br /> TOTAL PETROLEUM HYDROCARBONS <br /> Method GC-FID <br /> Laboratory Analysis Borehole soil Samples <br /> 749 E. Charter Way, Stockton <br /> f : Reported as PpM (ug/g) <br /> li <br /> Depth in Feet <br /> , • BM-1 BM-2 BM-3 <br /> 5 <br /> ►.;: 10 - ND ND <br /> 15 - ND ND <br /> t+ 20 ND ND <br /> �a 25 230 ND ND { <br /> 30 28 ND ND , <br /> i.+ A 35 220 ND ND i <br /> 320 ND ND <br /> 40 76 - N i <br /> Detection Lm, 250 10 <br /> 10 <br /> ra Fill Material at BM-1 depth 15 feet <br /> :Y EPA Method 8020 <br /> TPH Benzine �.�llieue <br /> 6100 39 Xylenes Ethyl Bewnzine <br /> 330 <br /> 850 3 20 <br /> Det.Lm. 500 5 <br /> � ' 5 15 5 <br />