3 of 3 Pages <br /> ErDt oQp 1 s <br /> • Uri l ling Monitoring Wells : <br /> All downhole equipment will be decontaminated using steam, to <br /> clean off all soil prior to use Wells will be drilled with a <br /> continuous flight hollow stem auger All wells will have a <br /> diameter at least 4 inches greater than the rasing diameter <br /> (OD) <br /> Core samples will be taken every 5 feet A core of the <br /> capillary fringe will be obtained The well will be logged <br /> geologically and the blow counts will be recorded Also the <br /> odor of each sample will be noted and the presence of any free <br /> hydrocarbon product <br /> Prior to removing any equipment from the hole the TD will be <br /> measured Once the casing is placed in the hole an accurate <br /> mea;»rement of the total amount of casing must be made The <br /> difference between the two figures will be explained by the well <br /> logger <br /> All drill cuttings will be placed in drums, sealed and the <br /> drilling intervals for the cuttings in each drum will be marked <br /> an the drum The drum;. will remain stored at the site until the <br /> contamIuation can be assessed through the laboratory sampling <br /> • Completion <br /> Slotted ca,inr (0 02 inch slots ) wi1i be rapped with a bottom <br /> plug The slots will extend 5 feet above the estimated water <br /> table indicated during drilling Clean 0 3 sand will be placed <br /> opposite the slotted casing and 1 feet above the last slot. At <br /> this time: the well will be surged for 5 minutes to attempt to <br /> eliminate any voids in the sand pack At the end of the surging <br /> the top of the sand will be measured and additional sand will be <br /> added if necessary Directly above the sand a 3 foot plug of <br /> hydrated bentonite chips wi11 be placed Above the plug a seal <br /> of cement grout will be placed to the surface The top of the <br /> casing wall be crapped and a traffic box and will be cemented in <br /> Place around and above the top of the casing. <br /> The cement cox bentcan.ite grout will will be placed in the annulus <br /> by the use of a trime pipe if the total annulus seal distance as <br /> over 30 feet { Bul 74--90 Cal Water Well Standards ) <br /> The well will be developed by bailing within a day of drilling <br /> to remove most, of the sediment within the casing and to remove <br /> bridging fines within the slots and sand pack This will be done by <br /> surging using the well water if possible, if not then only <br /> Potable water may be used A log of the amount of introduced water <br /> will be kept, and its use will be kept to a minimum. Bailing and <br /> surging will continue until the water does not contain any fine <br />. silt and or clay The amount of water added to the well to <br /> develop it must be removed from the well during developement. <br /> All purged water will be stored in drums, the drums will be <br /> sealed and left on site until the condition of the water is <br /> assessed <br />