Laserfiche WebLink
2 o f 4 Pages _ <br /> The recovered water and fuel will be= placed--in a steel drum <br /> which will be sealed and left on site until it can be removed <br /> by a licenced hazardous waste hauler. We expect the water to <br /> be removed within 1 week after the pumping. <br /> A report of this work will be forwarded to the county Health <br /> Deptartment upon completion. _ <br /> QUALITY :ASSURANCE/QUALITY CONTROL ' <br /> The following :licensed professional people will be_ involved in <br /> this project. <br /> Site Manager: Mr. Andy Younan, (209) 526 5251 <br /> Project Manager: Mr. John Cussen, REA 1979, (619) 486 1323 <br /> Protocols <br /> All equipment which enters the well will be decontaminated - <br /> using either steam or washing with TSP and clean water. - The <br /> equipment will be rinsed with clean water after is has been <br /> washed. <br /> All removed well water and fuel- will be placed immediately into <br /> - ./ a 55 gallon drum. The drum will be sealed and placed in a non- <br /> traffic area of the station. _ <br /> HEALTH AND SAFETY PLAN <br /> GENERAL SAFE WORD. PRACTICES <br /> California Geophysical Group, Inc. is..-responsible for the <br /> safety of all California Geophysi-cal Group employees on-site. <br /> .A-li ..general safety guidlines and-procedures will conform to: <br /> 29 CFR 1910. 120 <br /> * Standard Operating Safety Guides (U. S. E. P. A. , Nov. 1984) <br /> All containers will be labeled identifying them at to their- <br /> contents. <br /> heircontents. Hazardous material will be labeled- with yellow labels <br /> and identifying the person to contact— <br /> All excavation/drilling work will comply with Title 8 Article G <br /> of the California Administrative Code and local ordinances. <br /> Personnel are not allowed to eat or smoke on the site. <br /> The project manager/safety officer is John. Cussen 619 486 1323 <br /> and or Mr. Andy Younan (209)- 526-5251. <br />