Laserfiche WebLink
• i <br /> rd l soi i samp [Gs wj � i be placed in scaled containers -,uppJ zL-c ry <br /> -.he analytical lab and stcred in an ice chilled box until <br /> reLea. ,ed ti , ;he lab gall sampling equipment wall he cleaned <br /> wiT-h soap ,and water ana rinsed and dried with clean towels prior <br /> to any sampiinp, Water samples wiil be obtained using a Teflon <br /> Bailer and decanted to sample VOA vials and stored on ice <br /> All samples will be accompanied by a chain of custody form <br /> Lab Analysis <br /> Samples iaill be sent to a State Registered Lab for analysis <br /> All sail samples will be tested ;dor THP (Gasoline) and the <br /> highest samples will be tested for BTX&E Treater samples will be <br /> tested for THP(Gasoline) and BTX&E <br /> Final Report <br /> A final report of this phase of the work will be prepared and <br /> sent to you and will include all well logs, geologic cross-- <br /> sections and lab analysises The data will be placed in tabular <br /> form and will include our analysis of the vertical and <br /> horizontal extent of the conuamination the stratigraphy in the <br /> zone of contamination and our recommendations for further work <br /> either remediation or furTher geologic studies as required by <br /> the county <br /> We estimate this work will take about 3 months to complete once <br /> the county has accepted this plan The total cost for this part <br /> of the plan has been supplied to you previously Any variations <br /> from that bid will be billed separately <br /> Yours truly, <br /> California Geophysical Group, Inc <br /> t <br /> John Cussen <br /> President <br /> Attachments Location Asap <br /> Site Plan <br /> QA/QC Plan <br />