Laserfiche WebLink
FEB 01 '90 13:46 TWINING 46S, FRESNO 2092687126 P 18/19 <br /> REPORT DATE : February 1, 1990 PROJECT MORS Matt Bulli$ <br /> EXAMINATION NO. : 690-0256.1 page 2 of 3 <br /> CLIENT : Fillner Construction <br /> PROJECT : Darpetro <br /> DATE SAMPLED : 01-12-90 at 0835 by M. Luna <br /> DATE RECRIVBD: 01-12-90 at 1538 from M. Luna <br /> DATE PREPARED: 01-33-90 <br /> DATE ANALYZED: 01--29-90 <br /> ANALYZED BY : S. Singh, D. Petersen, M. Peterson <br /> RZVIEWBD BY : J. Koelawyn <br /> SAMPLE TYPE : Boil <br /> SAMPLE IDENTIFICATION: WO-1 <br /> RESULT METHOD MDL <br /> (mQ/kg? {mq/kq? <br /> Benzene ND 8030 0.01 <br /> Toluene 0.05 8020 0.01 <br /> Ethylbenxene ND 8030 0.01 <br /> . Xylenes ND 8030 0.01 <br /> TEPR ND Mod 418.1 10 <br /> PCB ND In House 0.03 <br /> NOTES: <br /> mq/kq: Milligram per kilogram <br /> Preparation (BTEX & Gasoline) 5030 <br /> PreParaltion (TEPH) : 3550 <br /> TZPH: Total Extractable Petroleum Hydrocarbons <br /> MDL: Method Detection Limit <br /> ND : None Detected <br /> Frn" Motlaslo VFswia pekeâ–ºafield <br />