My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010505
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
ARCHIVED REPORTS XR0010505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 11:21:26 AM
Creation date
3/5/2019 10:24:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010505
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LABORATORY TESTING <br /> The soil and water samples will be tested as follows: <br /> STEM Detection Limits <br /> Soil BTEX -- EPA 5020 Benzene 5 .0 ppb <br /> Toluene 5.0 ppb <br /> Ethyl Benzene 5 .0 ppb <br /> Each Xylene 5. 0 ppb <br /> TPH Soils -- D.O.H.S./LUFT Manual 1 . 0 ppm <br /> Water BTEX - EPA 602 Benzene 0../ ppb <br /> Toluene O,J�ppb <br /> Ethyl Benzene 0. ppb <br /> Each Xylene 0.5 ppb <br /> TPH Water - D.O.H.S./LUFT Manual 50 .0 ppb <br /> SCHEDULING <br /> This schedule is developed base upon a starting time, which is <br /> the time the Public Health Services approved this work plan. <br /> . Obtaining permits and encroachment 4 weeks <br /> Hydropunch Testing 2 weeks <br /> Boring and Monitoring wells 2 week <br /> Vacuum well installation 2 weeks <br /> Prepare final site assessment 4 weeks <br /> Solicit bid for Phase III work 3 weeks <br /> Install Phase III equipment and Start Up. 3 months <br /> Obtaining entry permits may take longer than estimated. Each <br /> property owner usually requires a meeting with their legal consul <br /> and the preparation of legal documents. Also scheduling of the <br /> drilling rig depends on rig availability. <br /> Yours truly, <br /> 'John Cussen <br /> President <br /> • cc: Mr. Roger Liston, Darpetro, Inc. <br /> Mr. Steve Sasson, Environmental Health Division <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.