Laserfiche WebLink
i <br /> that the tanks had leaked. <br /> In January, 1990 , three monitoring wells (BM-1 , BM-2 and BM-3) <br /> were installed to a depth of 50 feet below ground surface (bgs) . <br /> At that time, the groundwater level was about 43 .5 feet bgs. <br /> When quarterly monitoring was performed in April, 1991 the wells <br />' were dry. They remained dry until April , 1995, after the heavy <br /> rains in the winter of 1995 . <br />' In April, 1992 , we installed 3 additional wells (BM-4 , BM-5 and <br /> BM-6) to replace the 3 original wells. in order to complete the <br /> definition of the groundwater and unsaturated zone contamination <br />' 5 additional wells were installed. Wells BM-7 and BM-8 were <br /> installed in August, 1993 and wells BM-9 , BM-10 and BM-11 were <br /> .installed in September, 1994 . <br /> Based upon groundwater information from well BM-9, 2 hydropunch <br /> samples were obtained in June, 1995 to help define the possible <br /> plume from the west. The findings from this work were reported <br /> in the Activity Report dated June 30 , 1995. <br /> PLUME DESCRIPTION <br />' Unsaturated zone <br /> The soil units under the site consist of clays, silts and sands . <br /> A cross section between BM-9 and boring B--1 is attached as Figure <br /> 4 . <br /> Based upon the sampling information from all the wells and <br /> borings we have estimated the position of the plume in the <br /> unsaturated zone for this site in Figures 2 , 3 and 4 . Two <br /> monitoring wells are located along the west side of the property, <br />' they are BM-3 and BM-7. BM-3 did not contain any recordable <br /> contamination and BM-7 had minor amounts of contamination in the <br /> zone from 40 to 50+ feet bgs. It is our belief the unsaturated <br /> contamination, from this site, extends a few feet to the west of <br /> BM-7. We do not believe site contamination has migrated more <br /> that 10 to 20 feet to the west of well BM-7 . No contamination <br />' has migrated to the west of well BM-3 . <br /> Saturated zone <br />' The hydraulic gradient of the groundwater under this site is to <br /> the northeast, which has been recorded in 10 quarterly monitoring <br /> reports out of 15 samplings. Three monitorings have recorded <br /> gradients to the east southeast, one monitoring has recorded a <br /> gradient to the north and one monitoring to the north northwest. <br /> The gradient average to the east is 0 .0072 feet/foot. The <br /> hydraulic conductivity at this site is 2 .94 feet/day The <br /> estimated effective porosity of the aquifer is 0 .30. The average <br /> fluid velocity in the water table aquifer is 0 .07 feet per day. <br /> Page 2 <br /> r <br />