Laserfiche WebLink
I <br />' WELL SAMPLING SHEET <br /> 1 DATE:–October 11, 1995 <br />' SITE _749 E. Charter Way, Stockton, CA <br /> Well Number:—BM-2 Sample No. CBM-2 <br />' Depth of Floating fuel Ft. <br /> Depth of Well _50.2 Ft. Water Depth After Pruge <br /> Depth of Water - y;z y3 Ft. Top of Screen _35 Feet Bgs. <br />' Column of Water Ft. <br /> One bore hole vol . (Col . of Water X Factor)= Gallons. <br />' Well was purged with a Bailer Pump <br /> Purging Measurements: <br /> Borehole Temperature Ph Conductivity <br /> Volume <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> Time Purging ended Time Sample was taken <br /> Notes. <br /> ODOR: <br /> ISheen of Product: <br /> Color: <br /> Sampler qo ti a ) Signature <br /> IFactors. <br /> 2" Casing=0.72 Gal/Ft <br /> 4" Casing=1 65 Gal/Ft. <br /> I <br />