Laserfiche WebLink
o I i <br /> I <br /> Purged water will be placed in a sealed drum and left at the site The drums will be labeled for the source of <br /> I the water After the chemical analyses are completed the contamination in each drum voll be assessed If <br /> the chemical analyses of the water in a drum shows the water to be free of contamination then this water , <br /> will be disposed of as clean water Contaminated water will be removed from the site by a licensed waste <br /> hauler <br /> Water samples will be taken from the water at or near the surface of the water table, unless otherwise <br /> indicated The containers will be filled so that zero headspace is present in the sealed vial before placing in <br /> Ithe cooler A Chain of Custody will be filled out by the sampler The one liter brown bottles for TPH-diesel i <br /> must have a small 40 to 60 ml of headspace, if not the bottle will break during transport <br /> All laboratory results, well measurements and the Chain of Custody must be sent to our office for evaluation <br /> and the preparation of a report <br /> I <br /> I i <br /> k , <br /> 1 <br /> 3 <br /> 1 <br /> 1 <br />