Laserfiche WebLink
1 site We have placed this work on our schedule and plan to drill and sample these wells <br /> in October 2004 <br /> 1 Conclusions <br /> We will continue to monitor this site The next monitoring event will take place in October <br /> 1` 2004 <br /> The thirteen (13) wells at this site have been redeveloped and the WaTerra inertia <br /> pumping unit was installed with dedicated tubing in each well <br />' Attached are two Hazardous Waste Manifests showing the purged ground water has been <br /> removed properly <br /> I <br /> IYours truly, R <br /> \StEGFS( <br /> P1 C�js,PO�''i <br /> ., <br /> John Cussen No.6506 <br /> � <br /> RG #6506 <br /> Enclosures <br /> 2 Tables <br /> 5 Figures <br /> 2 Laboratory Reports and Chain of Custod(es <br /> 13 Sample Sheets <br /> I cc Mr Roger Liston, Darpetro, Inc <br /> RWQCB, Sacramento <br /> I <br /> I <br />