�i <br /> Since CGG has contracted with Del-Tech to do the quarterly monitoring at this site we are <br />' °7 submitting the SOP's of Del-Tech to be reviewed by the EHD San Joaquin County CGG <br /> feels that the SOP's of Del-Tech meet the requirements of sampling monitoring wells By <br /> June 21,2004 we will submit an up dated copy of our QA/QC Del-Tech at our request will <br /> Ibe using the Dedicated Waterra Pump to purge the wells <br /> It is the policy of CGG to notify the county at least 48 hours prior to a quarterly sampling, if <br /> this was not done for the January 2004 monitoring event, we apologize <br /> As president of California Geophysical Group, Inc , I have never instructed any technician <br /> that the equipment did not need to be decontaminated for sampling any well <br /> The next quarterly monitoring event will take place in July 2004, all monitoring wells on <br /> and off site will be sampled All laboratory samples will be tested for TPH-G, BTEX, by <br />' method EPA 602, Oxygenates, 1-2 DCA and EDB by method EPA 8260 Quarterly <br /> sampling of all wells and laboratory tests will continue until otherwise directed by the EHD, <br /> San Joaquin County We will be on site to oversee this next monitoring event <br />' We are now using MW instead of BM for the monitoring well labels The numbers for the <br /> wells will remain the same You will notice in this Quarterly Report that we have <br /> implemented this change <br />' The groundwater in wells MWA, MW-5, MW-6, MW-7, MW-8, and MW-9 were above <br /> California Drinking Water Standards for benzene The benzene plume appears to be <br />' flowing around this site from the two contaminated sites, west of this site The wells which <br /> had TPH are MWA, MW-2, MW-5 MW-6, MW-7, MW-8 and MW-9 All of the figures <br /> indicate that water is entering this site from a source to the east of this site This can be <br /> seen by looking at the contouring around well MWA where water is definitely entering the <br /> site from Charter Way See Figures 2 and 3 <br /> The contamination from this site is TPH and chemicals related to gasoline MtBE was <br />' recorded in wells MW-1, MW-2, MW-3, MW-7, MW-8, MW-9 and MWA 1 This anomaly <br /> is the same as reported for Benzene and TPH <br /> Monitoring well MW-8 was sampled this quarter with a bailer and pump, at the request of <br /> the EHD regulator <br /> Dissolved oxygen levels were recorded this quarter at this site The levels were <br />' measured with a calibrated YSI model 51 B meter by placing the sensor 5 feet below the <br /> surface of the water table after the bailing of the wells The measured levels are shown <br />' on Table 3A and Figure 5 <br /> Conclusions <br />' We will continue to monitor this site The next monitoring event will take place in July <br /> 2004 <br />' Attached please find the Hazardous Waste Manifest showing the purged ground water <br /> •� has been removed properly <br />