Laserfiche WebLink
r <br /> - <br /> CALIFORNIA GEOPHYSICAL GROUP, INC. <br />' O Box 578341, Modesto, CA 95357 �, Tel (209) 527-1247 <br /> -� <br /> January 26, 2005 3N Fax (209) 527-4810 <br />' <br /> Public Health Services <br /> RE(Cmym <br /> San Joaquin County FE13 0 9 2005 <br /> 304 East Weber Ave 3rd Floor <br /> Stockton, CA 95202 ENVIRONMENT I�EALTH f <br /> PERP41T/,,),cpViCES <br /> RE Quarterly Report January 2005 <br />' Darpetro, Inc USA Service Station <br /> 749 E Charter Way <br /> Stockton, CA <br />'ra Site No 1060 <br />' This site was sampled on January 11, 2005 Sherwood Labs of Hilmar, California <br /> analyzed the samples, their reports are attached <br /> Table 1 lists the history of the water table depths, elevations, water analyses and oxygen <br />' levels at this site since January 26, 1990 Table 2 lists the hydraulic gradients and <br /> bearings Sampling protocols are included <br /> 10 <br /> FINDINGS <br /> The groundwater gradient bearing is N 85 E and the gradient is 0 0001 Ft/ft See Table 2 <br />' and Figure 1 <br /> Each well was measured for depth of water prior to any wells being purged The depth to <br /> water in the first measurement is written and noted on the sample sheets <br />' The groundwater in wells MW-1, MW-5, MW--6, MW-7, MW-8, MW-9, MW-10, and MW-11 <br /> were above California Drinking Water Standards for benzene The benzene plume <br /> appears to be flowing north around well MW-1 Wells MW-7 and MW-9 are contaminated <br /> from sites, west of this site See Figure 2 <br /> The wells which had TPH are MW-1, MW-2, MW-3, MW-4, MW-5, MW-6, MW-7, MW-8, <br /> I MW-9 MW-10, MW-11 and MW-13 Wells MW-4, MW-7 and MW-9 are contaminated <br /> from sites entering this site from a source west of this site See Figure 3 <br /> MtBE was recorded in wells MW-1, MW-2, MW-3, MW-4, MW-5, MW-7, MW-8, MW-9, <br />' MW-11 and MW-13 Wells MW-3, MW-4, MW-6, MW-8, MW-12 and MW-13 had levels <br /> under 5 ug/L <br /> Dissolved oxygen levels were recorded this quarter The measured levels are shown on <br /> Table 1 and Figure 5 <br /> On October 16, 2004, we submitted a revised work plan for the drilling of additional wells <br /> and a boring at this site <br /> (• <br />