My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010738
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
ARCHIVED REPORTS XR0010738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 12:55:12 PM
Creation date
3/5/2019 11:01:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010738
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of three calculated casing purge volumes <br />' Next, the well is resounded to assure that a minimum of 80% water column recharge <br /> has been achieved Once well stabilization has occurred, the well is sampled through <br /> the dedicated discharge tubing Only containers with the appropriate preservatives are <br />' used to collect these samples All sample containers are provided by a State Certified <br /> Laboratory (pre-preserved voas) All samples are labeled and logged on the Chain of <br /> Custody, then placed on ice in an ice chest until delivered to the laboratory, within 48 <br />' hours The locking cap and lock are put on the top of the casing and then the well <br /> head is closed <br /> Purged water will be stored in a sealed drum and left on site The drums will be labeled <br /> properly After the chemical analyses are completed the contamination in each drum <br /> will be assessed If the chemical analyses of the water shows to be free of <br />' contamination it will be disposed of properly <br /> CGG has submitted sample blanks, which were pure water and had the voa's tested <br /> and the laboratory results showed no contamination Using a sample blank in the field <br />' (site) with the waterra system, there is no cross contamination <br /> The objectives for the monitoring program is to quartelry measure the depth of the <br />' water in the casing from a surveyed reference point of the top of the casing Obtain a <br /> water sample from the water within the slotted casing in each well and have a <br /> laboratory test for the chemicals which the regulator requires <br />' The purpose of this labor is to inform the consultant and the regulator the direction of <br /> the groundwater flow and its gradient If changes in any of these items, they will be <br /> noted and possible other wells will be needed to define the contamination plume <br />' If the site is in remediation, this monitoring will keep the consultant and the regulator <br /> informed of the progress of the remediation If the remediation system is not effecting <br />' part of the site, then modifications will be made to assure that the remediation is <br /> removing the contamination When the remediation is complete and the wells show <br /> acceptable or no contamination, then a closure for the site is requested <br />
The URL can be used to link to this page
Your browser does not support the video tag.