My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 2:02:19 PM
Creation date
3/5/2019 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeofogicafTechnics Inc. <br /> 2741 River Road <br /> Mo&%,to,CaIforma 95351 <br /> (209)538-6424/Fax#538-5852 <br /> i <br /> August 2, 2000 <br /> via fax: 916-777-4101 <br /> Project No. 724.2 <br /> Project Name: Morita Bros. (Charter) <br /> Robert Vickery 1 <br /> V&W Drilling Company <br /> P.O. Box 51 <br /> Rio Vista, CA 95471 <br /> RE: Request for Quotation- Hollow Stem Auger Drilli Ing Job <br /> Morita Brothers, 814 E. Charter Way, Stockton, CA <br /> r Geological Technics Inc. requests a cost estimate for the' following scope of work. The cost <br /> estimate will need to be submitted as two separate bids- one for the shallow wells and one for the <br /> deep wells. <br /> Monitoring Well Installation (5) <br /> Geological Technics Inc. proposes to drill 2 water table monitoring wells and 3 discretely <br /> screened deeper wells.. The well locations are shown on the attached site map. <br /> Construction of the shallow monitoring wells is as followsll <br /> 1. MW-6, MW-7: Drill and sample at 5 foot intervals to total depth of± 40 feet bgs. <br /> 2. Groundwater is expected to be—30 feet bgs. <br /> 3. Schedule 40 PVC casing with flush threads. <br /> iamScreen of Sand Packtans Seal Grout Seal <br /> sand - 1i - -sur ace <br /> Construction of the deep monitoring wells is as follows: '! I <br /> ' 1. MW-106, MW-107: Free drill to 40' then drill and sample at 5 foot intervals to a total depth I <br /> of± 60 feet bgs. <br /> 2. MW-104: free drill to 50' then drill and sample at 5 foot intervals to a total depth of± 90 feet <br /> bgs. <br /> 3. Schedule 40 PVC casing with flush threads. <br /> ` iamScreen Slot Sand PackTrans Seal Grout Sea <br /> sand - 150- -sur ace <br /> (1) 2"/90' 87.5-90' 0.010" #12 sand 85.5-90' 812.5-85.5' 82.5'-surface j <br /> Drill cutting to be containerized in 55 gallon DOT approved drums. Drilling equipment decon <br /> water to be contained in 55 gallon drums. Wells are to be surged during filter pack placement. <br /> Transition seals for the shallow wells will need to cornsist of granular bentonite. Retarded <br /> hydration, (weighted) bentonite pellets are required for the deep wells' transition seals. Grout <br /> f <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.