Laserfiche WebLink
i <br /> i Geolo icaf7ecknics Inc. Page 2 <br /> Morita <br /> Project No.: 724.2 <br /> August 10,2000 <br /> I <br /> Copies of the work plan and addendum's to the Work Plan, SJC PHS/EHD correspondence, <br /> f groundwater monitoring reports, drilling bids and an itemized budget spreadsheet of costs for <br /> performing this work are enclosed for your review. <br /> Proposed Direction of Project <br /> The work approved by the County is summarized below: <br /> 1. Drill and install one discretely screened deep well, MW-104, in the vicinity of the former <br /> dispenser island. <br /> 2. Drill and install a shallow/deep well pair, MW-6 and MW; 106, down gradient of well MW-2. <br /> i 3. Drill and install a shallow/deep well pair, MW-7 and MVV-107, down gradient of the former <br /> UST excavation. <br /> 4. Analyze four soil samples from each borehole for the following: <br /> • Benzene, toluene, ethylbenzene and xylene (BTEX) by EPA method 8020/602. <br /> • Gasoline range petroleum hydrocarbons (TPH-Gas)by EPA method 5030/8015(m). <br /> • Methyl Tertiary Butyl Ether (MTBE)by EPA method'8020/602. <br /> • MTBE in soil samples will be confirmed by utilizing by EPA method 8260. <br /> 5. Develop the five new monitoring wells. j <br /> 6. Place the five new wells on a quarterly monitoring schedule with the other five monitoring <br /> wells for a period of one year. Include two monitoring events for testing water samples for <br /> i the oxygenated fuel compounds (MTBE, DIPE, ETBE, T�iAME & TBA, plus 1,2-DCA, EDB, <br /> Methanol & Ethanol) by EPA method 8260 and dissolved oxygen and oxidation-reduction <br /> potential. <br /> 7. Prepare a site characterization report after well installation and initial monitoring. <br /> 8. Prepare three groundwater monitoring reports. <br /> Listed below is a proposed schedule for implementing this prof ject. <br /> Proposed Bidding of Project <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested a bid from <br /> V&W Drilling to drill and install five groundwater monitoring wells (three deep and two <br /> shallow). GTI has found V&W to be very cost effective for three primary reasons: i <br /> I • reasonable charge rate <br /> } • fast drilling equipment <br /> ! • well trained crew <br /> G <br /> I <br /> These costs have been included in the attached opinion of cost spreadsheet prepared giving <br /> estimated costs for performing the work approved by SJC,! PHS/EHD. The opinion of cost <br /> spreadsheet shows itemized cost for the tasks proposed. In an"attempt to make this Pre-Approval <br /> flow smoothly, GTI has used the same unit costs for this work that has previously been approved <br /> by the USTCFP for other projects. <br /> f <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. GTI then pays these charges. <br /> i <br /> { <br /> I <br /> t <br /> If. <br />