My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:27:36 PM
Creation date
3/5/2019 11:46:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a - <br /> CW100a I reCk0acs lx C <br /> 1101 71°Street a C <br /> Modesto,califomia 95354 LSH <br /> (209)522-4119/Fax#522-4227 ovkRURMU11 <br /> SERA CES <br /> p�R <br /> r <br /> October 3, 2002 <br /> Project No.: 724.2 <br /> Project Name: Morita(Charter) <br /> Mr. Frank Morita <br /> 6622 Belmont Place <br /> Stockton, CA 95207 <br /> RE: Addendum: Additional Site Characterization Work Plan dated June 27,2002. <br /> Location: Morita Brothers, 814 E. Charter Way, Stockton, CA <br /> Dear Mr. Morita: <br /> Geological Technics Inc. is pleased to present the following Work Plan Addendum for our <br /> June 27, 2002 work plan for additional site characterization. This addendum is presented in <br /> response to the San Joaquin County Environmental Health Department's (SJC/EHD) <br /> September 3,2002 correspondence directives for an addendum to the plan. <br /> In summary, the following modifications will be made to the work plan (see attached site <br /> map for well locations): <br /> • Only one shallow monitoring well (MW-11) will be installed instead of the four <br /> proposed. <br /> • Intermediate wells MW-110 and MW-11 I will be installed as proposed; wells MW- <br /> 108 and MW-109 will be moved west of their proposed locations (approximately <br /> half the distance to wells MW-5 and MW-6) as overhead utilities and trees allow. <br /> • A deep well MW-202 will be installed near MW-2. The new well will be developed <br /> and sampled on the day of installation with a 24-hour laboratory turn around time. <br /> If the well is non-detect, then two additional deep wells (MW-205 & MW206) will <br /> be installed near wells MW-5 & MW-6. If MW-2 is impacted, then three additional <br /> deep wells (MW-208, MW-209 & MW-210) will be installed near wells MW-108, <br /> MW-109&MW-110. <br /> • The deep wells will be screened in the 70-80 feet below grade surface interval. <br /> Sw.� zsnt <br /> it Nlti/Gy� k l"j se rt kwlgl - <br /> 1 ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.