Laserfiche WebLink
G eoCo l ' <br /> (off ecFinics Inc. <br /> L (20)5-4&"Zff4X*SM-5852 <br /> 2741 X#rr$gad Ca*rnk 9M51 <br /> L July 7,2000 <br /> L Project No.: 724.2 <br /> Project Name: Morita(Charter) <br /> LMr. Frank Morita <br /> 6622 Belmont Place <br /> Stockton, CA 95207 <br /> RE. <br /> Report: Soil& Groundwater Investigation <br /> LLocation: Morita Brothers, 814 E. Charter Way, Stockton, CA <br /> Dear Mr. Morita: <br /> Geological Technics Inc. is pleased to present the attached Work Plan for additional site <br /> characterization in which we propose the following exploratory work at 814 E. Charter Way, <br /> Stockton, CA: <br /> • Install one soil boring/monitoring well (2 inch)to a maximum depth of 90 feet below <br /> grade. Collect and test soil and groundwater samples for TPH-gasoline, BTEX and <br /> MTBE range petroleum hydrocarbons. <br /> • Place the new well and the five existing groundwater monitoring wells on routine <br /> Lquarterly monitoring for a period of one year. <br /> If you have any questions or need additional information, please contact nae. Thank you for <br /> this opportunity to serve your environmental needs. <br /> Respectfully submitted, <br /> N <br /> �. (3eo*&a Te&acs.2nc. <br /> Raynold I. Kablanow II,Ph.D. <br /> LVice President <br /> cc: Carol Oz—SJC PHS/EHD <br /> Mark List-CRWQCB-CVR <br /> USTCFP <br /> L <br />