Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LAG 1999 <br />' SAMPLE LOCATION/MW - 1 DATE: 11/16/99 <br /> PROJECT NAME: MORITA BROTHERS ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br />' ADDRESS. CHARTER WAY SAMPLE TIME: 1246 <br /> CITY,STATE STOCKTON,CA SAMPLE CONTAINERS 4 VOA'S / 1 BLANK <br /> SITE CONTACT PRESERVATIVES HCL <br />' CONSULTANT. GEOLOGICAL TECHNICS LAB.ANALYSIS BY: SHERWOOD LABS <br /> PROJECT MANAGER RAY KABLANOW MONUMENT: FLUSH <br />' SAMPLER: DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.: 2" / 0 1632 <br /> SAMPLE MED GROUNDWATER P.I.D.READING/ODOR: 0 MUSTY <br />' TOP OF CASING ELE TION: MSL COLOR: CLEAR <br /> DEPTH TO WATER. (feeL100th's) 3291 FEET CALC.PURGE VOL.. 5163648 GAL <br /> DEPTH OF WELL- (feeL100th's) 6455 FEET TOTAL VOLUME PURGED: 165 GAL <br /> STANDING WATER COLUMN: 3164 FEET DEPTH OF PUMP BAILER FEET <br />' FIELD PARAMETERS <br /> TIME CASING DRAW PUMPING pH E C. TEMP. O.R.P. DISSOLVEU TURBIDITY <br />' 'VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (DTW) (GPMILPM) (units) (MsMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 N/A BAILER 758 796 204 -35 N/A CLEAR <br />' <br /> 55 762 781 203 -108 <br /> 11 757 781 205 -110 " <br /> 165 758 780 205 -115 " <br /> I <br />' PURGE METHOD PURGERPUMP <br /> SAMPLE METHOD 4'STAINLESS STEEL BAILER W/STAINLESS STEEL.WIRE LINE <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 35 22' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br />' WELL,LOCATION SEE SITE MAP <br /> REMARKS GOOD RECHARGE <br />' WEATHER WND NW5 <br /> QUALITY CONTROL ALL PURGING EQUIPMENTAND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH SM"CLEANER do ALCONOX SOAP NEW NITRILE GLOVES <br />' CONTAINMENT D O T 17 55 GAL..STEEL DRUM OR 60 GAL.POLY DRUM <br /> INSTRUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN ME= <br /> SOLINMT SLOPE NEPER THERMODINE 580E P I D <br />' KECK PMRFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT: WATER: 4 SOIL: 0 <br />