Laserfiche WebLink
' Geclogica[Technus Inc Page 4 - - - <br /> Groundwater Monitoring Report <br />' Project No 724 2 <br /> . June 4, 1999 <br /> 1 <br /> The County has approved a work plan for additional site characterization work and a cost <br />' pre-approval request has been submitted to the USTCFP for this work The new wells will <br /> be scheduled for installation as soon as the approval has been received <br /> 1 3.0 LIMITATIONS <br /> This report was prepared in accordance with the accepted standards and practices of the field <br /> of environmental geology, groundwater hydrology and good business practices It should be <br /> recognized that definition and evaluation of environmental conditions is a difficult and <br />' inexact science Judgments leading to conclusions and recommendations are generally made <br /> with an incomplete knowledge of the site-specific conditions present <br />' The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, <br />' is made <br />'. 4.0 SIGNATURES AND CERTIFICATION <br /> This project was performed by Geological Technics Inc in accordance with accepted <br />' geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation <br />' This report was prepared by <br />' Geologtca( echnws Inc. <br />' Michael J Nierm �OfE.551ok4 <br /> Geologisto <br /> n if <br /> 4 _ � NO 5234 <br /> rRaynold I Kablanow II, PhD <br /> California Registered Geologist 45234 <br /> Certified Hydrogeologzst #442 <br />