Laserfiche WebLink
I <br /> DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT DAME. Monta BrcaMars SAMPLE ANALYSIS PERFORMED ;TPH-Gas, 8.,T .E <br /> 614 East Martar AMPLE.TIME: 16;4.0 <br /> Stoddonf CA 95207 SAMPLE,0ONTAINEA($), SUPPLIED BY LAB <br /> 2VOA 's <br /> LAB ANALYSIS COMPLETED BY: SHERD( OOD <br /> CLIENT HUNTER & ASSOCIATES DATE 02/12/94 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-2 <br /> AMPLER DON LIGHT START TIME 15 00 <br /> GROUNDWATER XXX ADOSE OTHER WELL HEAD P I D READING 46 2 PPM <br /> CASING ELEVATION (FEET MSL) CASING DIAMETER 2 INCH <br /> I <br /> DEPTH TO WATER 51 22 FEET CALCULATED PURGE VOLUME 2 41 GAL <br /> i <br /> DEPTH OF WELL 66 02 FEET ACTUAL VOLUME PER PURGE 2 5 GAL <br /> TIME VOLUME PH E.c. TEMP. COLOR OTHER <br /> HL.[ <br /> gallons units mshoskm Degrees G (Visual) <br /> 1500 0 73 975 205 VERY TURBID GAS ODOR <br /> (DARK GREY) <br /> 25 73 973 200 " <br /> 50 73 964 202 " <br /> 75 72 953 201 " <br /> PURGE METHOD ELECTRONIC BAILER /WITH A 3 FOOT STAINLESS STEEL BAILER <br /> SAMPLE METHOD 1 FOOT STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS NEW MONUMENT ASSEMBLY INSTALLED AND GROUTED UP <br /> WEATHER CLEAR & COLD <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION ON THE EAST SIDE OF LOT, NEXT TO BUILDING <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> iORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> RECEIVED KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5808 PHOTO IONIZATION DETECTOR <br />