My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
ARCHIVED REPORTS XR0011096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 5:55:31 PM
Creation date
3/5/2019 2:01:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011096
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"O"togual Teelma Jne Page 4 <br /> Morita <br /> Risk Evaluation Work Plan <br /> Project No 724 2 <br /> March 18,2002 <br />' 2.3 Appendix B Closure Checklist <br /> eThe checklist will be completed and the following items addressed <br /> 1 Well Survey <br />' 2 Site Maps <br /> 3 Geologic Cross Sections <br /> 4 Stockpiled Soil <br />' 5 Monitoring Wells <br /> 6 Groundwater Gradient Tabulated Data <br /> 7 Analytical Tabulated Data <br /> 8 Contaminant Contours <br /> 9 Remedial System <br /> 10 Reports/Information <br /> 11 BAT <br />' 12 Background <br /> 13 Residual Contamination <br /> 14 Model Parameters <br /> 15 Rationale <br />' 16 WET or TCLP Tests Results <br /> 3.0 SCHEDULE & REPORTING <br /> MGeological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> plan approval and cost pre-approval from the USTCFP <br /> The information gathered during this phase of work will be presented in a report, which will <br /> include a summary of the field surveys and an analysis of groundwater gradient variation <br /> Regular quarterly groundwater events will continue as scheduled <br />' The project will be supervised by Dr Ray Kablanow, the registered professional geologist <br /> responsible for the work Copies of the reports will be forwarded to the appropriate County <br /> and State regulatory agencies <br />
The URL can be used to link to this page
Your browser does not support the video tag.