My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011121
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
ARCHIVED REPORTS XR0011121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 4:41:23 PM
Creation date
3/5/2019 2:37:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011121
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monta Brothers Service Station 14 July 16, 1992 <br /> lip <br /> of groundwater characterization Drilling for all borings will be accomplished using <br />' a truck mounted CMETm 75 drill ng or equivalent utilizing 8 314-inch outside diameter <br /> hollow-stem augers Th — __ he _a max�mim "devt i 25— t-belor ] <br /> the�ftrst~~-� —ground--water;—or—approxzmatcly 75—feet_ .below surface grade <br /> Soil sampling will be performed while drilling the borings at a five foot interval <br /> beginning at 5 feet below grade to the designed termination depth Soil sampling <br />' will be accomplished using a split-spoon sampler (ASTM D 3550 with shoe similar to <br /> ASTM D 1586) equipped with three 6-inch by 2 5-inch diameter brass sleeves for soil <br /> retention The soil samples will be obtained by driving the sampler with a one <br /> hundred and forty pound hammer dropping thirty inches in accordance with ASTM D <br /> 1586. <br /> ' 1 <br /> The lowermost sleeve at each sample interval (corresponding to approximately 6 <br /> inches below the actual sample interval) will be screened for total organic vapors <br /> with a portable photo-ionization detector (PID) or a Foxboro@ OVA (organic vapor <br /> ' analyzer) 108 flame-ionization meter (FID) Headspace vapor analysis will be <br /> performed by first discarding a portion of the soil retained at one end of the sleeve to <br /> produce a headspace The sleeve is then capped and the probe of the PID or FID <br /> inserted through a hole in the cap and into the headspace for analysis The PID or <br /> FID readings will be recorded on the boring log The uppermost sleeve will be <br /> observed for lithology <br /> ' The middle sample sleeve of the sampler will be immediately sealed with Teflon <br /> film, capped, labeled, and placed on ice at 40C for transport to a California Department <br /> ' of Health Services (DHS) certified laboratory Strict chain-of-custody procedures will <br /> be utilized for all samples collected to ensure sample integrity and to document <br /> sample possession from the time of collection to the final destination Two samples <br /> collected from the boring will be retained for possible laboratory analysis <br /> All sampling equipment will be washed with TSP (tri-sodium phosphate) cleanser, <br /> and rinsed with tap water and de-ionized water prior to sampling, between sample <br /> intervals, and between borings to reduce the possibility of cross-contamination The <br /> EB-8101-3 9207-E037 WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.