My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
3500 - Local Oversight Program
>
PR0544230
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 8:24:45 PM
Creation date
3/5/2019 3:52:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544230
PE
3528
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
02
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Control Board <br /> Division of Financial Assistance <br /> 1001 I Street•Sacramento,California 95814 A �O G <br /> Alan C.Lloyd,Ph.p, P.O.Box 944212•Sacramento,Cali mia-•94244 8 ' <br /> (916)341-5761.FAX(916)341-5806* www.wa erboards.ca.g6v/cwphome/uU <br /> stcf ,tyold Schwarzenegger <br /> Agency Secrera�y F'.' CC) Governor <br /> Efi�ijpbb WEH L <br /> 4,EAl.Ti4 DEPP,RTP4E4d� <br /> VAN DE POL ENTERPRISES, INC. <br /> DAVID ATWATER <br /> P O BOX 1107 <br /> STOCKTON, CA 95201 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND { UND),NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 0.18342;.FOR SITE ADDRESS: 1033 CHARTER WAY W. _ .F• . . <br /> STOCKTON <br /> Your claim has been accepted for placement on the Priority Listin Priority Class "C"with a deductible <br /> of$5,000. <br /> We have completed our initial review. The next step in the -laim review process is to conduct a <br /> compliance review: <br /> Compliance Review: Staff reviews,verifies, and processes laims based on the priority and rank within a <br /> priority.class. After the Board adopts the.Phority List,your claim will remain on the Priority List until <br /> your Priority Class.and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the.local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed toverify eligibility.. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine.that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation, or your claim application contains a material error, the claim will be rejected. In such <br /> event,you will be issued a Notice of Intended Removal fro the Priority List,,informed of the basis for <br /> the proposed removal of your claim, and provided an opportanity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent.misrepresentation. <br /> Record keepin. During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1) copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled cheeks used to pay for work shown on the <br /> invoices, (3) copies of technical documents (bids,narrative ork description,reports), and (4) evidence <br /> that the claimant paid for the work performed (not paid by a other party). These documents are necessary <br /> for reimbursement and failure to submit them could impact t1ric amount of reimbursement made by the <br /> Fund- .It is not neeessar))to submit these doemnents at this tune; however, they will definitely be <br /> rewired prior to r•eirnbnrsemen.t. <br /> Compliance with Corrective Action Requirerhents:`In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3, Title 23, California Code of Regulations. Article 11 categorized the <br /> corrective action process into phases. In addition, Article 11 requires the responsible party to submit an <br /> California Ell vironmental Protection Agency <br /> .C1 Recycled Pape <br />
The URL can be used to link to this page
Your browser does not support the video tag.