Laserfiche WebLink
tJ <br /> , I t <br /> 1 I t j <br /> , i I <br /> 30 May 2004 <br /> AGE-NC Project No 02-0962 <br /> Page 10 of 10 - <br /> equipment will be pressure washed prior to starting each boring Cuttings generated during drilling r <br /> and rinseate generated during drilling and ground water sampling activities will be containerized in <br /> properly labeled DOT-approved 55-gallon drums,and stored on-site in an area lacking public access <br /> r Disposal alternatives will be evaluated based on results of soil and water analysis <br /> a, <br /> _ t <br /> t <br /> " r <br /> r <br /> • w I I h <br /> a 1 <br /> t <br /> I t ' <br /> I <br /> r f <br /> , I <br /> F t x I <br /> I ` <br /> Advanced GeoEnvironmental,Inc <br />