My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001090
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
3500 - Local Oversight Program
>
PR0544230
>
ARCHIVED REPORTS XR0001090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 8:01:29 PM
Creation date
3/5/2019 3:59:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001090
RECORD_ID
PR0544230
PE
3528
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
02
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Site Assessment Work Plan <br /> VANCO TRUCK & AUTO PLAZA <br /> 1033 West Charter Way, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION ,- - _ _ _ _ PAGE , ,y i <br /> 10 INTRODUCTION . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . 1 <br /> 21 REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING 1 <br /> 22 UNDERGROUND STORAGE TANK PIPING REMOVAL 2 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 31 PERMITTING AND PRE-FIELD WORK ACTIVITIES 3 <br /> 32 CPT DRILLING AND SAMPLE COLLECTION 3 <br /> 3 3 ' INSTALLATION OF MONITORING WELLS 4 <br /> 3 3 1 Drilling and Soil Sample Collection 4 <br /> 3 3 2 Monitoring Well Installation, Development and Survey 5 _ <br /> 3 3 3 GROUND WATER SAMPLING AND ANALYSIS 5 <br /> 34 REPORT PREPARATION 5 <br /> 40. FIELD PROCEDURES . . . . . . . . . . . . . . 6 <br /> 41 CPT SOIL BORINGS 6 - <br /> 42 <br /> -42 MONITORING WELL INSTALLATION 7 <br /> 4 2 1 Well Completion and Well Elevation Survey 7 <br /> 4 2 2 Well Development 8 <br /> 43 GROUNDWATER SAMPLING PROCEDURES 8 <br /> 43 1 Static Water Level Measurements 8 <br /> 4 3 2 Well Evacuation 9 <br /> 4 3 3 , Sample Withdrawal 9 <br /> 4 3 4 Sample Handling 9 <br /> r 4 4 EQUIPMENT DECONTAMINATION 9 <br /> FIGURES <br /> v Figure 1 -Location Map 4 <br /> Figure 2 -Site Plan <br /> Figure 3 -Adsorbed TPH-d in soil <br /> Figure 4 -Dissolved TPH-d to soil <br /> Figure 5 -Monitoring Well Diagram ' <br /> TABLES <br /> Table 1 -Analytical Results of Soil Samples <br /> Table 2 -Analytical Results of Ground Water Samples <br /> 3 ' <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.