Laserfiche WebLink
• 09 September 2003 <br /> AGE-NC Project No 02-0962 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> , <br /> -Work party(ies)-consisting of two persons will perform the following tasks <br /> PROJECT TEAM LEADER: TASK: <br /> Donna J Sexton Direct excavation/collect samples <br /> FIELD CREW: TASK: <br /> Excavator Operator este heavy equipment <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used <br /> • Hand gripping throat Out of air, can not breath <br /> Gnp partner's wast or bath hands around waist Leave area immediately <br /> a <br /> Hands on top of head' Need assistance <br /> Thumbs up OK, I am alright, I understand <br /> Thumbs down No, negative <br /> r ' <br /> 8.0. EMERGENCY MEDICAL CARE <br /> St. Joseph's Medical Center located at 525 West Acacia Street, and is approximately 5 minutes <br /> from the site A map and route to the hospital Is attached , <br /> Local ambulance service is available at phone 911 Their response time is 5 minutes <br /> 4 <br /> a <br /> Advanced GeoEnvironmental,Inc <br /> r <br />