Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> VI11 . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational ? Q ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, El F]functional) tested , and confirmed operational? <br /> 19 Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings ? Q 1:1 ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? Q Q ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? 0 ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ ❑ <br /> disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? 0 ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply) ❑ sump ❑X Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e. g . , modem) operational? ❑ El Q <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN -TANK GAUGING TESTING <br /> ❑X Check this box if tank gauging is used only for inventory control . (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for El ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally El 1:1 1:1tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ 1 ❑ 1 ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ❑ I ❑ I ❑ <br /> For any answer of "N" above, describe in Section Xl how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />