My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3028
>
2800 - Aboveground Petroleum Storage Program
>
PR0530029
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 11:33:52 AM
Creation date
3/6/2019 10:59:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0530029
PE
2834
FACILITY_ID
FA0019299
FACILITY_NAME
PACIFIC ETHANOL STOCKTON LLC
STREET_NUMBER
3028
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14502008
CURRENT_STATUS
01
SITE_LOCATION
3028 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION,CONTROL AND COUNTERMEASURE CERTIFICATIONS AND MANAGEMENT APPROVAL <br /> PLAN(SPCC) <br /> Pacific Ethanol,Stockton. <br /> 1.0 CERTIFICATIONS AND MANAGEMENT APPROVAL Professional <br /> Engineer's Certification [112.3(D)] <br /> I hereby certify that I am familiar with the requirements of Title 40 of the Code of Federal Regulations <br /> (CFR) Part 112 and that my agent has visited and examined the Pacific Ethanol, Inc. facility located on <br /> 3028 Navy Drive, Stockton, California. I also certify that this Spill Prevention, Control, and <br /> Countermeasure Plan has been prepared in accordance with good engineering practices, including <br /> consideration of applicable industry standards, and with the requirements of 40 CFR 112. Furthermore, <br /> I certify that procedures for required inspections and testing have been established and that the SPCC <br /> Plan is adequate for the Facility. Certification of this plan is also contingent on implementation of the <br /> requirements specified in Section 2.2.4. <br /> Such certification shall in no way relieve the Pacific Ethanol, Stockton. (facility) of the duty to prepare and <br /> fully implement the SPCC Plan, in accordance with therequirementsof 40 CFR Part 112. <br /> Seal ss►p, gy: of F--�--- <br /> .��N� � Kevi ucha, P.E. <br /> California P.E. No.:C70110 <br /> `* up * Date: February 2019 <br /> s� cnn� <br /> 1.2 Documentation of Plan Review And Evaluation [112.5] <br /> A record of amendments to the SPCC Plan per Section 2.1.1, periodic review and evaluations per Section <br /> 2.1.2, and certification of technical amendments per Section 2.1.3 must be documented and provided <br /> below. Reviews that do not result in any amendments to the SPCC Plan must also be documented in the <br /> table below. <br /> Table 1-1 Record of SPCC Plan's Periodic Reviews, Amendments, and Certifications <br /> Activity Revision Date Made by Amendments to <br /> No. Plan?(Technical, <br /> (if reqd.) Non-Technical, <br /> None) <br /> Original 0.0 June 2011 3rd Party Consultant None <br /> Issue <br /> Summary of Review or Change: <br /> Initial SPCC Plan Development <br /> Signature(include P.E.No.if required): <br /> Revision 0.1 Sep 2014 Pacific Ethanol Non-technical <br /> Summary of Review or Change:Add corn`oil extraction system; <br /> administrative edits <br /> Signature (include P.E. No. if required): <br /> www.erm.com Projec[No.:0453993 Pacific Ethanol 28 September 2018 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.