Laserfiche WebLink
MemI Task Statue Comments <br /> 3.0 Tank Equipment <br /> 3.1 V.I. or Check for leaks. uVes ouNlA ThefnkaninnlvesarenouxxJ,xawe er,thesaonaary cemamment is mmpletelrmncetl antl <br /> , Took drenvaNes uVw'oNT'IfWA <br /> -card ane onlyaacesslblemautngrfea parwnnel, <br /> must be greatlooked. <br /> 32 spill a.Inspect fir debris, uYee':No*NIA <br /> conlainmeM rwldue,afd water in <br /> bores on fill Ne Lox antlremwe. <br /> Pipe b.Brain valves must uVes•BNo PIA <br /> he operable and <br /> clause. <br /> 33 liquid lapel a.Bold vlaual and CYaa BNd•T'N/A <br /> equipment m¢chaniwl dwicea <br /> est he inspected Me gi are not equipped add lik id lerel resignent Ameasuring nick is pmviaed for determining the <br /> he physical damage. liquid foil of exM1 bulk perage lank.The facility is wrren[N 1pefive a ad all hi witbin the squad, <br /> b.Chea,than the CYaper[M ' /A ...al...mareempry. rental used equipment will be lnsglled prior to reuse. <br /> device is easily <br /> readable <br /> 341Nemll a.if equipped with a flYes CNo' /A <br /> equipment "test•burden, <br /> agNate the audible The And wt equipped with oreftequipment.A measuring sYIX is provided be caroming,the <br /> hCT or lightM rpuid keel of each bulk i[a rose lank.Me tan6aremmeartivemndul during the filling m akwas to <br /> confirm operation. preventoverXllmg.Thericane is mrreRty maclNeard all nors within the secondary deartment are <br /> This mould be baXery wriot, oredlll equipment will be bnarea pwrm <br /> powered.Replace <br /> the battery If needed <br /> b.If ove?II valve is oYes uNo'; A <br /> equipped WMha The sysi are not equipped With metal equlpmerR Ameasunq Ntkapmviaeabraeterminingthe <br /> Mechanical twt liquid level of...himlk9tngetant The tanks are mnnantly attended during the 0lhng precessm <br /> mChars. ,a41uat¢ preadinderawfifing1XefatllXylscurrenllylnctive andall MUwlthin Nesemnaarymntainmentare <br /> the meehanlam til errors. Overfill equipment will demeaned prom to reuse. <br /> wnfirm up erelion. <br /> 3.5 Piping Check for leaks, uVes• <br /> connectionsxlw aand!damage <br /> 4.0 Tank Atfacbmerlls and Appeartherinfifirm,w <br /> 4.1 Ladderand Seeurewith no 3lg n ' `ayes BNNIA e•0tie laaderrvng hash.kefiaff&osT11mesuanq.Thefarilhy incorrectly m active amalusiswithin <br /> plaHOmh of 5¢y¢R CorNJ <br /> elOn lhesemntlaryambe.me tit are dri taken ming will be reWirel...r to re res, <br /> sirudure or dam, ¢? <br /> 5.0 other Conditions <br /> 5.1 Are there o0l¢r tuned...that should uVes• <br /> be addressed far continued safe <br /> operation or than may affect The site Will <br /> reveMlon lan9 <br /> AST INSPECTION STANIMftO 30 SEPTEMBER 2011 <br />