Laserfiche WebLink
Nomellini Construction page 2 <br /> 1045 W . Charter Way, Stockton <br /> Two of these wells will have screens placed deeper than any of the existing <br /> monitoring wells screens at the site. One well is to be placed in the area of MW- <br /> 10/CPT-2 and the other well is to be placed in the area of MW-4/CPT-3 . The third <br /> well is to be installed near CPT-4 to investigate the contamination found in a water <br /> sample collected between 55 and 57 feet below ground surface in CPT-4 . <br /> A work plan for conducting pilot tests for remedial alternatives and installation of <br /> additional monitoring wells is to be submitted to EHD by September 4 , 2007. The <br /> discussion on the hydrological units and the wells that are screened across more <br /> than one hydrological unit is to be submitted with this work plan . <br /> You may contact Michael Infurna, Senior REHS at (209 ) 468-3454 should you have <br /> any questions . <br /> Donna Heran , REHS , Director <br /> Environ entaIH ealth De a ent <br /> �� <br /> Michael J . Infurna Jr. , enior REHS MargaetLagorio, REHS . <br /> LOP - Unit IV Program Coordinator Unit IV <br /> MI/ <br /> cc: CVRWQCB — James Barton , Sacramento . <br /> AGE — Art Deicke, 837 Shaw Rd , Stockton . <br /> SWRCB-Clean Up Fund — Mark Owens , Sacramento. <br /> v <br /> E <br /> f <br /> l_ <br /> i' <br /> f <br /> i <br /> i- <br /> c <br /> is <br /> i <br /> f <br />