My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:45:06 PM
Creation date
3/6/2019 1:50:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Site Assessment Work Plan <br /> NOMELLINI CONSTRUCTION CO. <br /> 1045 West Charter Way, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1 .0. INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . a a 660a . . 00 . . 6aa50a0a0aaa0 & 040x1 <br /> 2.0. SCOPE OF WORK as & 0a . . . . 00 . . . 0 . 00 . 655 . a5a 69a0000 & 00 a a665aawaa & . . . . . . <br /> 1 <br /> 2. 1 , PERMITTING AND PRE-FIELD WORK ACTIVITIES . . 2 <br /> 2.2 . PILOT BORINGS AND WELL INSTALLATIONS . . . . . . . . 11A <br /> 2.3 , PROPOSED REMEDIATION METHOD AND FEASIBILITY. 3 <br /> 2 .4 . PREPARATION OF REPORT OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.0. FIELD PROCEDURES. . . am 000060 # 60m mmasommom * 6 @gas a a 0 0 a a a 0 a a 0 a 0 a 0 0 a a a 6 a 5 <br /> 3 . 1 . PILOT BORING AND SOIL SAMPLING. . . . . . . . . . . 5 <br /> 3 .2, MONITORING WELL INSTALLATION. 1 1 1 1 1 1 1 1 . . 5 <br /> 3 .3 , WELL DEVELOPMENT AND SURVEY. I I I I I I I I I I I I I 1 6 <br /> 3 .4, DPE SYSTEM DESIGN AND IMPLEMENTATION, I I I I I I I 1 6 <br /> 3 .4. 1 . Field Measurements, , 7 <br /> 3 .4.2. Collection and Analysis of Vapor and Ground Water Samples. . . . . . . . . . 8 <br /> 3 .4.3 . Reporting. . . . 8 <br /> 3 .4.4. Equipment and Operational Safety, 9 <br /> 3 .4.5. Permitting Requirements. I I I I I I I I I I 1 0 1 1 1 1 1 1 1 1 1 1 9 <br /> 3 .5 , WASTE MANAGEMENT. IF I 1 11 11 1 IF I . IF I I I I I . . . . . . 9 <br /> FIGURES <br /> it Figure 1 - Location. Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Proposed Monitoring Well Destruction Locations <br /> Figure 4 - Deep-zoned Well Design <br /> Figure 5 - DPE Schematic <br /> Figure 6 - DPE Well Design <br /> TABLE <br /> Table I - Well Construction Details <br /> Admueed GeeEnviroumental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.