My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:45:06 PM
Creation date
3/6/2019 1:50:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Interim Remediation Work Plan - March 2009 <br /> Nomellini Construction Company <br /> 1045 West Charter Way, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . 1 <br /> 2.0 PRINCIPLES OF DUAL-PHASE EXTRACTION. . 1 <br /> 3.0. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3 . 1 . PERMITTING AND PRE-FIELD WORK ACTIVITIES . 3 <br /> 3 .2 . INSTALLATION OF INTERIM REMEDIATION <br /> SYSTEM PIPING NETWORK. 1 11 11 1 1 11 11 1 1 11 11 1 1 1 11 1 11 1 11 1 1 1 11 1 . 1 1 3 <br /> 3 .3 , REMEDIATION SYSTEM ENCLOSURE. . . . I . . . . . . 1 . . . . . . . . . . . . . . . . . . 1 3 <br /> 3 .4. PROPOSED INTERIM DUAL PHASE REMEDIATION SYSTEM. . . . . . . . . . . 3 <br /> 3 .5 JUSTIFICATION FOR EXTRACTION WELL SELECTION. . . . . . . . . . . . . . . . 4 <br /> 3 .6. INTERIM REMEDIATION MONITORING AND MAINTENANCE. . . . . . . . . 5 <br /> 3 .7. REPORT PREPARATION. . . . . . . . . . I . . . . . . . . . . . . . . . . . I . . . . . 1 1 1 1 1 1 1 1 . 5 <br /> 4.0. FIELD PROCEDURES. . mamma a a V a 6 0 0 0 a M M a 6 s a 5 <br /> 4. 1 . PERMITTING. . . . 6 <br /> 4.2 . REMEDIATION SYSTEM PIPING NETWORK, 6 <br /> 4.3 , DUAL PHASE VAPOR EXTRACTION SYSTEM DESIGN, . . . . . . . . . A 6 <br /> 4.3 . 1 . DPE-Soil Vapor Extraction Monitoring. I I I I I I I I I I 1 7 <br /> 4.3 .2. DPE-Ground Water Extraction Monitoring. . . I I I I I I I I . . . . . . . . . 9 <br /> 4.3 .3 . DPE-System Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> FIGURES <br /> Figure l - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Theoretical SVE ROI <br /> Figure 4 - Proposed Underground Piping Network <br /> Figure 5 - Proposed Interim Remediation Trench Details <br /> Figure 6 - Dual Phase Extraction System Schematic <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.