My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:45:06 PM
Creation date
3/6/2019 1:50:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H <br /> N gra►, <br /> M <br /> Nomellini Construction page 2 <br /> 045 W . Charter Way, Stoektov <br /> The placement of MW- 12 and MW-10 has not completed the vertical extent <br /> investigation of the dissolved gasoline constituent plume. Additional vertical <br /> investigation is required . The EHD will require additional monitoring wells to be <br /> placed in MW-10 and MW- -1 2 areas that are screened in HU-4, as well as additional <br /> deeper monitoring wells for the vertical investigation/delineation . <br /> The EHD has noticed that there is no monitoring or shallow vapor well screened <br /> across the current water table in the areas around MW4 or MW-2 . A shallow, first <br /> interface monitoring well is required in these a,eas for iateral definition of the status of <br /> the first ground water unit. <br /> The work plan for further delineation required by the EHD in our May 11 2007 <br /> correspondence is to include details to destroy the monitoring wells screened in two <br /> permeable hydrological units, install replacement wells , and install additional deeper <br /> and first interface monitoring wells noted in this correspondence. Please submit the <br /> work plan to Geotracker by July 10, 2007. <br /> You may contact Michael lnfurna , Senior RENS at (209) 468-3454 should you have <br /> any questions. <br /> Donna Heran , REHS , Director <br /> Environmental Health Department <br /> � .�_. <br /> Michael J . lnfurna Jr. , Senior REHS Nuel Hendefson , PG <br /> LOP - Unit IV Engineering Geologist <br /> MI/ <br /> cc_ CVRWQCB — ,James Barton, Sacramento . <br /> AGE — Art Deicke, 837 Shaw Rd , Stockton . <br /> SWRCB-Clean Up Fund — Mark Owens, Sacramento . <br />
The URL can be used to link to this page
Your browser does not support the video tag.