Laserfiche WebLink
All work for this project was performed under the responsible charge of a Registered Geologist. Our <br /> professional services were provided using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities.The findings were mainly based upon <br /> analytical results provided by an independent laboratory Evaluations of the hydrogeological conditions <br /> at the site for the purpose of this investigation are made from a limited number of available data points, <br /> and subsurface conditions may vary away from these data points. The information contained in this <br /> report has received appropriate technical review and approval. This acknowledgement is made in lieu of <br /> all warranties, either expressed or implied. <br /> Project QUARTERLY REPORT- December 1994 <br /> i <br /> Nomellini Construction Company j <br /> 1045 West Charter Way <br /> Stockton, California <br /> Job No. SC-94-09.1026-02 <br /> I <br /> Performed by: Geological Audit Senices, Inc. <br /> 1803 West March Lane, Suite A <br /> Stockton, California 95207 <br /> Report b, <br /> I <br /> Bob Marty Date <br /> Project Manager <br /> Re►ie%ed and Approied by <br /> JOHN }AY <br /> ROW, <br /> CcrjFail) �3 <br /> ENGINEENAG <br /> A4:�74 A=t-fir GEOLOGIST NO 1018 <br /> y fXTI LSrJ <br /> ATE <br /> ohn a ob its Date <br /> (SVelr eo gaster Ge logist #3489 OF <br />