My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001118
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0001118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 5:30:57 PM
Creation date
3/6/2019 2:25:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001118
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Quarterly Report - December 1998 <br /> NOMELLINI CONSTRUCTION CO. <br /> 1045 West Charter Way y <br /> Stockton, California <br /> 1.0. INTRODUCTION <br /> Advanced GeoEnvironmental,Inc (AGE)has prepared this Quarterly Report for 1045 West Charter <br /> Way,Stockton, California The site setting is illustrated on Figure 1 Site structures and monitoring <br /> well locations are depicted on Figure 2 <br /> The objective of the work was to install a remediation system within the petroleum hydrocarbon- <br /> impacted core area, monitor dissolved petroleum hydrocarbon concentrations in ground water and <br /> to characterize ground water flow direction and gradient on the site This report is prepared in <br /> accordance with guidelines established by the San Joaquin County Public Health Services - <br /> I Environmental Health Division (PHS-EHD) and by the Central Valley Regional Water Quality <br /> Control Board(CVRWQCB) for investigation of underground storage tank(UST) sites A summary <br /> of previous investigations at the site was included in the Quarterly Report - February 1996, dated <br /> 17 May 1996, prepared by AGE <br /> 2.0. PROCEDURES <br /> In October and November 1998, seven soil vapor extraction(SVE) wells, five in-situ_ air sparging <br /> (IAS) wells and the underground IAS/SVE piping system were installed at the site, in December <br /> 1998, ground water monitoring and sampling was performed at the site on wells MW-I through <br /> - MW_9 T <br />' 21 INSTALLATION OF SOIL VAPOR EXTRACTION/IN-SITU AIR SPARGE WELLS <br /> On 30 October 1998, seven soil borings for installation of SVE wells (VW-3 through VW-9) and <br />' five soil borings for installation of IAS wells (AW-1 through AW-5) were advanced at the site as <br /> part of corrective action related to the UST formerly at the,site Soil borings VW-3 through VW-9 , <br /> were advanced vertically to depths of 20 feet below surface grade (bsg) utilizing a B-55 truck- <br /> mounted drill rig equipped with 8-inch diameter hollow stem augers, soil borings AW-1 through <br /> -AW-5 were advanced to 30 feet bsg utilizing a B-55 truck-mounted drill rig equipped with 8-inch <br />' diameter hollow stem augers Soil cuttings were stockpiled and covered on plastic sheeting at the -site in an area lacking public access The SVE and IAS well locations are depicted in Figure 2 <br /> I , <br /> r E <br /> Advanced GeoEn,ironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.