Laserfiche WebLink
. r <br /> NOMELLINI CONSTRUCTION COMPANY <br /> MW-2(Screen Interval 32 to 52 feet) <br /> Graph of Benzene and Ground Water Depth vs Time <br /> 14,000 <br /> 35 <br /> RAS 33 <br /> 12,000 # <br /> r <br /> 31 <br /> s <br /> 10,000 <br /> ` 29 <br /> 8,000 27 <br /> aCL <br /> = 25 cw`i r <br /> CL 3a <br /> h 6,000 c <br /> 0 <br /> 3 <br /> 4,000 21 <br /> R <br /> v � <br /> l R <br /> � yJ <br /> > r 19 <br /> 2,000 <br /> 17 <br /> t <br /> 0 <br /> Feb-91 Jun-91 Dec-94 Mar-95 Jul-95 Nov-95 Feb-96 May 96 Aug-96 Nov-96 Feb-97 May-97 Aug-97 Nov-97 Feb- TP"g(pph} <br /> Date Groundwater <br /> Depth{feel <br />