My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001123
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0001123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 5:32:37 PM
Creation date
3/6/2019 2:26:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001123
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Co of 0 <br />16 April 1997 <br />SAGE -NC Project No 95-0121 <br />Page 2 of 2 <br />from $10,000 to 520,000 annually <br />I11r SITU AIR SPARGING <br />• Air sparging within moderately permeable aquifers generally results in a moderate reduction <br />of volatile hydrocarbon concentrations in the saturated zone Remediation durations are <br />generally comparable tiNith SVE Therefore, we anticipate a 12 to 24 month remediation <br />period will result in an 50 to 90 percent reduction in drssol-Ved shorter -chain hydrocarbons <br />I kS will not be as effectrve in r educing concentrations of longer -chain hydrocarbons <br />• Installation of an IAS system will require numerous sparging points, a piping system and <br />equipment Installation and setup costs are estimated to be $20,000 to 530,000 Maintenance <br />and rnomtonng costs bill be $10,000 to $20,000 annually Penodre costs, such as non -routine <br />maintenance and supplemental fuel, can range from $5,000 to 510,000 annually <br />Upon approval of the RAWP, a detailed cost estimate will be provided to Nomellini Construction <br />Company The opportunity to provide this service is greatly appreciated If you have any questions <br />or comments, please contact our office at (209) 956-0264 <br />Sincerely, <br />A(Ivanced GeoEnvironmental, Inc <br />Timothy J Cuellar <br />Staff Geologist <br />Enclosures <br />cc (2) addressee <br />(0 <br />Bob Marty- <br />Project <br />artyProject Geologist/Direct <br />
The URL can be used to link to this page
Your browser does not support the video tag.