My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0001126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:49:17 PM
Creation date
3/6/2019 2:27:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001126
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> e r <br /> s s , <br /> 04 October 1996 ` <br /> AGE-NC,Project P <br /> No 95-0121 <br /> Page 4 of 4 <br /> "levels, analytical results from samples collected,m these wells may not,be representative of <br /> shallow aquifer conditions <br /> • .Further assessment northeast of MW-4 and west,of MW-7 will be necessary to determine the, <br />' lateral extent of dissolved hydrocarbons ground water arid'to monitor possible migration of <br /> the plume as a result of ground water migration _ <br /> 1- <br /> ' ' 4 2 RECOMMENDATIONS <br /> Based upon data'collected from the site, AGE has the following recommendations <br />' •, At least two additional monitoring wells should be installed at the site one well should be <br /> considered for installation northeast of MW-4, a second well should be considered west of <br /> MW-7 <br /> Any additional rrionitonng wells installed at the site should-be completed to allow for the <br /> r extreme fluctuation of ground water elevation in the area <br /> • s ' <br /> A,Remedial Action Work Plan and addendum were submitted to the PHS-EHD in April and <br /> May 1996, respectively Upon regulatory approval, installation of the remediation system <br />' should commence I I e. - <br /> • The next quarterly monitoring should be scheduled for November 1996 ' <br /> , I ; <br /> 50. LIMITATIONS <br /> t v , <br /> Our professional'services were per-formed,iising that degree'of care and skill ordinarily exercised by a` <br /> environmental consultants practicing in this,or similar localities The findings were based upon <br /> analytical results provided by an independent'laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of available <br /> data points (i a bonngs, monitoring wells), and subsurface conditions may vary away Ifrom these data , <br /> ' points No other warranty, expressed or implied, is made as fo the professional recommendations <br /> contain4in this report <br /> 1'n 1 <br /> 1 <br /> a <br /> r <br /> , e <br /> I r <br /> , J i <br /> f , <br /> , v <br />
The URL can be used to link to this page
Your browser does not support the video tag.