My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001128
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0001128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 5:38:27 PM
Creation date
3/6/2019 2:28:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001128
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 April l g96 <br /> AGE`NC P <br /> roject No 95-0121 <br /> Wage b of 9 <br /> the IAS system , <br /> 33 pERMITT G <br /> An application for a site specific permit will <br /> Control District (SIVAPCD ~ <br /> be submitted to the San Joaquin Valley application are contained in q� prior to initiation of the remediation protect <br /> 1 the Cit ppendrx l3 Y Air pollution <br /> Y of Stockten Building D In addition, proper buildingExamples of a, <br /> g epartrnent for necessary permits Will be obtained from <br /> t <br /> construction work <br /> 34, SYSTEM MAINTENANCE <br /> The ,S VE�gs System ' <br /> recommendations wj11 be maintained on a <br /> Weekly After stabilization, routine maintenance Would according <br /> "clown time" for the unit ' to manufacturers <br /> down for routine maintenaricebout twice monthl Id represent' the onf <br /> Procedures such S 1assi�nnng 24-hour operation the y per rods of <br /> ubncation, oil c}tan T ) unit will be shut <br /> ` ging, and system adjustments <br /> 3 $ CONFIRMATION SOIL BORINGS <br /> When the protected clean-uphen <br /> p period has been completed or efficierie of <br /> Y placed confirmation soil borings will be advanced <br /> contamination The c Y tiie unit has declined <br /> hydrocarbon Ievels slit <br /> Present tlon Sol] borings ed within the projected area aftsa 1 <br /> '-' Ss will serve to a <br /> e site Pproxirr'ate remaining petroleum <br /> n j Soil Bonn s t - - ' <br /> g will be advanced to <br /> - sort probing Machine and a maximum depth of 35 feet utilizin <br /> beginning at I,5 feet 1 '125-inch rods g a van- <br /> below site Soil samples will be collcc ed ated hoe-foot ointe5400 <br /> diambe <br /> eter brass sleeves Fade(bsg� using a Geoprobe soil asseri'bf <br /> rvals <br /> tape or alu The middle brass sleeve Y and associated 1125-rnch , <br /> minium sheets, sealed with will be removed and the ends covered with Te <br /> a chilled container Each sample sleevleSw will be labeled caps, <br /> s <br /> ' time, date, sam Ier' P , secured will' tape, and immediate) hon <br /> TPI3-d p s initials, and trazis with the follower' Y Placed in <br /> and BTE&X pofted to a state certified laboratory g boring location, depth, <br /> r for analysis of TPH <br /> 4.0. PROCEDURES <br /> 41 v <br /> INSTALLATION OF,3 V <br /> APOR EXTRA <br /> For the installation of soil vapor extract' WELLS <br /> on wells, the following procedures will be <br /> ` perfornied <br /> G , <br />
The URL can be used to link to this page
Your browser does not support the video tag.