Laserfiche WebLink
f � , <br /> 12 February 1996 <br /> AGE-NC Protect No 95-0121 <br /> s <br />' Page 4 of 4 ` <br /> 4 <br />' A Corrective Action Plan(CAP)was subrrvtted to the PHS-EHD in November 1995 Installation and <br /> operation of a soil vapor extraction and in-situ air sparging system was recommended as the most <br /> viable on <br /> for site remediation Biostimulation/bioenhancement was recommended as a <br />' contingency plan if vapor extraction/air sparging does not produce significant results Upon approval <br /> of the CAP by the PHS-EHD, we recommend initiating installation procedures <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicmg in this or similar localities The findings were based mainly upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br />' conditions at the site for the purpose of this investigation are made from a limited number of available <br /> data points(i a monitoring wells) and subsurface,conditions may vary away from these data points <br />' No other warranty, expressed or implied, is made as to the professional recommendations contained <br /> in this report <br /> I <br /> I l <br /> I r <br />