Laserfiche WebLink
08,•16/95 WED 14:29 FAX 916 366 7013 KLEINFELDER ... STOCIMN 0003 <br /> KLEINFELDER <br /> PROPOSED SCOPE OF SERVICES <br /> AGST CLOSlURE ACTIVITIES <br /> INDEPENDENT TRUCKING COMPANY, <br /> STOCKTON, CALIFORNIA <br /> 23-` &zz-7(o ,Ao0 <br /> 23-YP4696 <br /> JULY 20, 1995 <br /> INTRODUCTION <br /> Kleinfelder is pleased to present this proposal to Independent Trucking Company to conduct <br /> limited soil assessment beneath two 10,000-1pflon aboveground storage tanks (AGSTs). Both <br /> AGSTs were formerly used to supply diesel fuel to refuse disposal trucks at the Independent <br /> Trucking Company maintenance yard at 1145 W. Charter Way in Stockton, California. Both <br /> tanks are presently empty. One of the tank:; has been moved to another area of the yard for <br /> temporary storage. The other tank is still in place. <br /> It in Meinfelder's understanding that Independent Truoking Company wishes to obtain regulatory <br /> closure of this site from the California Regional Water Quality Control Board. This proposal was <br /> prr.ared based on conversations with the RWQCB and Independent Trucking Company to asnosa <br /> the site for potential closure. Meinfelder is committed to providing quality service to Independent <br /> Trucking Company commensurate with your wants, needs and desired level of risk. If a portion <br /> of this proposal does not meet your needs, or if those needs have changed, Meinfelder will be <br /> pleased to meet with you to discuss alternatives and provide a revised proposal on that basis. <br /> The following work plan contains a summary of the proposed scope of services on a task-by-task <br /> basis. <br /> SCOPE OF SERVICES <br /> Task 1 -DrrMing Permits and Work Plan Submittal <br /> Prior to conducting the field activities, a drilling permit application along with this proposed scope <br /> of work will be submitted to San Joaquin County Public Health Services Environmental Health <br /> Division, (SJCEHD) for review and approval. The scope of work also will be submitted to the <br /> RWQCB for their review and approval. It is assumed that this proposal contains sufficient detail <br /> to be accepted for approval by SJCEHD and tlae RWQCB. <br /> Task 2 -Drilling and Sampling <br /> The AGSTs are located in a graveled portion cif the corporation yard at the Independent Trucking <br /> Company facility. The tank location is surrounded by an approximately 3 foot high, masonry <br /> containment wall. One of the tanks has been moved to another location in the yard, and one tank <br /> is still within the containment wall. Independent Trucking Company requested that the <br /> assessment activities be conducted without removing the second tank or containment walls to <br /> provide drilling access. <br /> 23-YP4696n?950035 (1995) Page 1 of 3 July 20, 1995 <br /> Copyright 1995 Meinfelder,Inc. <br />