Laserfiche WebLink
I. INTRODUCTION <br /> The purpose of this Site Safety Plan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the drilling of soil borings <br /> and soil sampling at Independent Trucking in Stockton, California. This plan describes <br /> hazard information and health and safety procedures to be followed by all designated field <br /> personnel during the soil boring & sample collection operations. <br /> II. FACILITY BACKGROUND/WORKPLAN <br /> A. Address <br /> 1145 West Charter Way, Stockton, California <br /> B. Location <br /> The approximately 10 acre site is located approximately one mile west of <br /> Interstate Highway 4. <br /> C. Schedule <br /> Completion of (3) vertical soil borings with the use of a truck mounted hollow <br /> stem drilling rig and (2) vertical soil borings to be completed with the use of hand <br /> auguring equipment. All activities to be conducted during daylight hours <br /> (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of drilling equipment for the coring, sampling of <br /> the soil and backfilling of the borings. <br /> For a more detailed description, please refer to the attached "Scope of Work" <br /> 1 <br />