My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
2900 - Site Mitigation Program
>
PR0009298
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:57:52 PM
Creation date
3/6/2019 3:16:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009298
PE
2960
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
01
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br /> The purpose of this Site Safety Plan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the drilling of soil borings <br /> and soil sampling at Independent Trucking in Stockton, California. This plan describes <br /> hazard information and health and safety procedures to be followed by all designated field <br /> personnel during the soil boring & sample collection operations. <br /> II. FACILITY BACKGROUND/WORKPLAN <br /> A. Address <br /> 1145 West Charter Way, Stockton, California <br /> B. Location <br /> The approximately 10 acre site is located approximately one mile west of <br /> Interstate Highway 4. <br /> C. Schedule <br /> Completion of (3) vertical soil borings with the use of a truck mounted hollow <br /> stem drilling rig and (2) vertical soil borings to be completed with the use of hand <br /> auguring equipment. All activities to be conducted during daylight hours <br /> (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of drilling equipment for the coring, sampling of <br /> the soil and backfilling of the borings. <br /> For a more detailed description, please refer to the attached "Scope of Work" <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.