Laserfiche WebLink
lin KLEINFELDER <br /> A-3 6 SOIL CUTTING DISPOSAL <br /> Drill cuttings will be placed in 55-gallon drums and left on site for disposal by the site owner If <br /> requested, Kleinfelder can coordinate disposal of soil and water after analytical results are <br /> available <br /> A-4 GROUNDWATER WELL INSTALLATION <br /> A-4 1 MONITORING WELL CONSTRUCTION I <br /> Construction details for shallow groundwater monitoring wells are as follows <br /> • The well casing will be 2-inch inside diameter, flush threaded point, schedule 40 <br /> PVC pipe <br /> + The wells will be constructed in 8-inch diameter borings <br /> • Well screen sections will be perforated with 0 010- or 02-inch factory-cut slots, <br /> depending upon field observations <br /> • The wells are generally screened from 5 feet above and 10 to 15 feet below first <br /> groundwater The screen length is reduced if an aquitard with a minimum <br /> thickness of 5 feet is encountered If an apparent aquitard is encountered, the well <br /> is usually terminated I to 2 feet into the aquitard Effort is made not to screen <br /> across two aquifers If confined aquifer conditions or high vadose zone <br /> contamination is encountered, the well screen is usually not set above the depth of <br /> first encountered groundwater Wells are usually not set in areas of suspected <br /> significant soil contamination <br /> • The PVC pipe and end caps are steam cleaned prior to installation <br /> • The annular space between the screen and the wall of the boring is backfilled with <br /> the appropriate clean Lone Star Industries 0/30 or 2/12 Monterey sand to <br /> approximately 2 feet above the top of the perforated sections Based on soil logs <br /> or a sieve test, modifications may be made regarding the size of sand to be used <br /> Installation of the 0/30 sand may require that the sand be tremmied, using clean <br /> water In this event, a sample of the tremie water is collected, unless the source is <br /> thought to be clean <br /> • A 3- to 5-foot bentonite plug is placed above the sand pack to provide a seal <br /> against surface water infiltration and to reduce the potential for cement grout to <br /> infiltrate into the water <br /> • The remaining annular space is filled to the surface with tremmied <br /> cement/bentomte grout to the surface <br /> • The wells are secured in an above- or below-ground locking stovepipe The well <br /> heads may be enclosed in a water tight cement utility box set flush to the ground <br /> surface when located in a traffic area <br /> 23-482276-SOO/CR96S276 A -5 October 17, 1996 <br /> Copyright 1996 Klemfelder,Inc <br />