Laserfiche WebLink
LS <br /> DEL— 1TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME INDEPENDENT TRUCKING SAMPLE ANALYSIS PERFORMED TPH-Gas/Diesel, <br /> 1145W CHARTER WAY BTXE <br /> STOCKTON,CA SAMPLE TIME- 12 55 <br /> AMPLE CONTAINER(S)- HCL PRESERVED <br /> V O A's, 1 LITRE & i BAILER BLANK <br /> ANALYSIS PERFORMED BY SHERWOOD <br /> CLIENT HUNTER &ASSOCIATES DATE, 04/11/1996 <br /> PROJECT MANAGER. BILL HUNTER SAMPLE LOCATION MW-1 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ADOSE OTHER. WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION FEET MSLCASING DIAMETER 2 INCH <br /> DEPTH TO WATER 19 56 FEET CALCULATED CASING VOLUME 3 0 GAL <br /> DEPTH OF WELL 38 10 FEET TOTAL VOLUME PURGED 9 0 GAL <br /> TIME VOLUME PH E C. TEMP O R.P COLOR OTHER <br /> allons tenets Umhas/cm Degrees C (Mvolts) (Visual <br /> 0 69 969 191 NIA CLEAR (STRONG) <br /> SEPTIC ODOR <br /> 30 67 970 190 " <br /> 60 67 972 190 " <br /> 90 67 970 190 " <br /> PURGE METHOD SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, NO LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLEAR SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION FAR SOUTH WEST <br /> CONTAINMENT POLY DRUMS <br /> INSTRUMENTATION. ORION pH/TEMPERATURE METER 2 POINT PH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> R7" t 1'v i. _j , <br />