Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME INDEPENDENT TRUCKING SAMPLE ANALYSIS PERFORMED TPH-Gas/Diesel, <br /> 1145 W CHARTER WAY BTXE <br /> STOCKTON,CA SAMPLE TIME 13 19 <br /> AMPLE CONTAINER(S) HCL PRESERVED <br /> V O A's, 1 LITRE & 1 BAILER BLANK <br /> NALYSIS PERFORMED BY SHERWOOD <br /> CLIENT HUNTER 8 ASSOCIATES DATE 04/11/1996 <br /> PROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-3 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ADOSE OTHER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION FEET MSL CASING DIAMETER 2 INCH <br /> DEPTH TO WATER. 19 84 FEET 12ALCULATED CASING VOLUME 3 08 GAL <br /> DEPTH OF WELL 38 75 FEET ITOTAL VOLUME PURGED 9 0 GAL <br /> TIME VOLUME pH E.0 TEMP O.R.P. COLOR OTHER <br /> gallons units Umhoslcm Degrees C Mvolts Visual <br /> 0 73 711 207 NIA CLEAR NO ODOR <br /> 30 74 720 208 " <br /> 60 74 714 209 " <br /> 90 75 713 209 <br /> PURGE METHOD SUBMERSIBLE PUMP <br /> SAMPLE METHOD 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, NO LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE WELL WAS COVERED WITH 4 INCHES OF BASE ROCK, <br /> NEEDED MAGNATOMER TO FIND IT <br /> WEATHER CLEAR SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION EAST OF SHOP <br /> CONTAINMENT- POLY DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 8 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 5808 PHOTO IONIZATION DETECTOR <br /> RECEIVE-0 <br />